Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sceaust/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sceaust/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simply-static domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sceaust/public_html/wp-includes/functions.php on line 6121
Re-use of processing waste from mining operations - SCE

Re-use of processing waste from mining operations

The Client

Our client owns and operates a Metallurgical Coal operation in the Illawarra region of NSW, producing high quality metallurgical coal used for steelmaking. Like SCE, the client is also committed to minimising the potential impacts of its operations on people and the environment.

The Challenge

The client was looking for help on beneficial reuse of waste generated during processing that ends up as landfill.

The Solution

SCE was able to help the client by establishing waste screening operations that produced a new saleable product.

The Result

  • Significantly reduction in waste to landfill for our client
  • Turned a waste product into a saleable product
  • Reduced operating costs related to landfill for our client.

Get a quick quote

Quick Quote

Click here to fill-out our full quote form instead.